Pool decks: new concrete decks, resurfacing and repair in Connecticut
Free estimate on new decks, resurfacing and repairs. Book in the off-season to be first in line for spring.
- Pitched away from the water
- Slip-resistant textures and sealer grit
- Coping joint sealed so water stays out
How we build a pool deck
A Connecticut pool deck spends half the year under snow and the other half wet, sunbaked and full of bare feet. The details that matter: the deck has to pitch away from the pool, the joint between the deck and the coping has to stay sealed, and the surface has to grip when it's wet.
We pour new decks, resurface old ones that are still sound, and fix the joint and drainage problems that let water under the coping, where it freezes and does the real damage.
- Base
- 4–6 in. of compacted processed gravel
- Thickness
- 4 in., reinforced
- Pitch
- 1/8–1/4 in. per foot away from the pool, to drains or lawn
- Coping joint
- Flexible sealant over backer rod between deck and coping
- Concrete
- 4,000 psi, air-entrained
- Finish
- Broom, knockdown texture, exposed aggregate or stamped
- Sealer
- Slip-resistant grit in any sealed surface
- Color
- Lighter tones that stay cooler under bare feet
- A
- 4 in. reinforced, air-entrained deck
- B
- Reinforcement on chairs
- C
- Control joints
- D
- 4–6 in. compacted processed gravel
- E
- Firm subgrade
- F
- Pitch away from the pool, 1/8–1/4 in. per foot
- G
- Sealant and backer rod at the coping joint
How the job goes
Site visit
We check the coping, drains, equipment pad and how water leaves the deck, and talk through finishes.
Demo and base
Old deck out where needed, base rebuilt, forms and drains set.
Pour and texture
Concrete placed, finished and textured; joints cut.
Joint and seal
Coping joint sealed, and the surface sealed with grit once cured.
Planning prices
| Work | Planning range | What drives it |
|---|---|---|
| New broom-finish pool deck | $11–$17 / sq ft | Pitched away from the water, joint at the coping |
| New stamped or textured pool deck | $16–$26 / sq ft | Lighter colors and a slip-resistant sealer |
| Resurface an existing deck (spray or knockdown texture) | $5–$10 / sq ft | The deck underneath must be sound |
| Replace the joint at the coping | $9–$18 / linear ft | Keeps water out from under the deck and coping |
| Lift and level sunken deck sections | $1,500–$4,500 | Typical residential deck |
Planning ranges for Connecticut in 2026, not quotes. Ledge, tight access, long pump or wheelbarrow runs and very small pours push a job up. Your price comes in writing after we've seen the site.
Pool deck work
- New pool decks
- Full replacement, or new decks around new pools coordinated with your pool builder.
- Resurfacing
- A spray-applied or knockdown overlay over a sound deck: new texture and color without demolition.
- Stamped decks
- Wood-plank and stone patterns with grit in the sealer. See stamped concrete.
- Coping joint repair
- Old caulk out, backer rod and sealant in. The cheapest way to keep water out from under the coping.
- Crack repair and leveling
- Sealing cracks and lifting sunken sections. See concrete leveling.
- Equipment pads and walks
- Pads for filters and heaters, and walks from the house.
Pool decks and Connecticut winters
Close the joint before you close the pool. Water that gets under the deck or behind the coping in fall freezes all winter. Check the coping joint every year at closing.
Salt-water pools. Splash from salt-chlorinated pools can be hard on concrete and sealers over time. Rinse the deck now and then and keep it sealed.
Scheduling. Spring is the busiest time for pool work. Booking a deck in fall or winter for a spring pour is the easiest way to have it finished before the pool opens.
Questions we hear about pool decks
Should I resurface or replace my pool deck?
Resurface if the deck is structurally sound: cracks are hairline and nothing has heaved or sunk. Replace if sections have moved, cracks are wide, or the deck pitches toward the pool.
How do you keep a concrete pool deck from being slippery?
Texture and grit. A knockdown or broom finish grips well, and any sealer we put down gets a slip-resistant additive.
What color pool deck stays coolest?
Lighter colors reflect more sun. Charcoal and dark browns get noticeably hotter under bare feet.
How long does a new pool deck take?
Most residential decks take about a week on site, plus cure time before heavy furniture. Stamped decks take a little longer.
Can you work around my pool builder?
Yes. The electrician's bonding grid has to be installed and inspected before we pour, and we coordinate coping and drains with the pool contractor.
Do salt-water pools damage concrete decks?
They can, slowly. Salt splash plus freeze-thaw is hard on the surface, so rinse the deck, keep it sealed and keep water from pooling.
Pool decks by town
We build pool decks in 67 Connecticut towns. Pick yours for local conditions, permit notes and nearby towns.
Every dot is a town we serve.
Free pool decks estimates
Call or send the estimate ticket. We set a time to see the site and put the price in writing.